BMW M2 2023 (Coupe) | VIN WBS11DM04P8D22912

729000 SEK
Fair price

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-06-11 729000 SEK
  • Listing date: 11.06.2026
  • Listing age: 0 days
  • Country: Sweden
  • License plate: WAN828
  • Source: bytbil.com
  • Lot number: 19206268
  • Condition: Used
  • Seller type: Dealer
  • Seller: Bilförsäljningen i Da…
  • VIN: WBS11DM04P8D22912

Price change history

Date Incl. VAT Excl. VAT Δ
2026-06-11 729000 SEK
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 4376 km
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 460 HP
  • Transmission: Automatic

Exterior

  • Paint: Black
  • Weight: 2155 kg
  • Length: 4580 mm
  • Width: 1890 mm
  • Height: 1400 mm

Interior

  • Number of seats: 4

Other information

  • Four wheels: No
  • CO2 emission standard: EU6

Equipment

47
  • ABS-BROMSAR
  • cruise control
  • ANTISLADD
  • AIRBAG DRIVER
  • Deactivatable passenger airbag
  • FRONT PASSENGER AIRBAG
  • TRAVEL COMPUTER
  • Rear Isofix attachments
  • rain sensor
  • Side airbags
  • SWEDISH SOLDIER
  • Seat heating (front)
  • External temperature gauge
  • ACC
  • reversing camera
  • MULTIFUNCTION STEERING WHEEL
  • STEERING WHEEL HEATING
  • GPS
  • Anti-glare rear-view mirror
  • Bluetooth (hands-free)
  • BRAKE-ASSISTANCE
  • ELECTRICALLY FOLDING SIDE MIRRORS
  • High beam assistance
  • Speed limiters
  • folding rear seats
  • Keyless Keyless Start
  • Light sensor
  • SERVER MANAGEMENT
  • STARTING POINT
  • Theft alarms
  • FATIGUE ALARM
  • AUTOBROMS
  • Anti-glare side mirrors
  • EURO 6
  • Led Floodlights
  • Emergency call
  • Parking assistance
  • Sports steering wheel
  • Split rear seat
  • SPORT CHAIRS
  • Start/stop function
  • Digital radio (DAB)
  • Power seat Driver
  • Carpets (textile)
  • Parking sensors (front)
  • Driving assistance
  • Wireless phone charger
Market analytics
BMW M2 2023 Coupe Petrol Automatic ~3.0L < 30 000 km Sweden
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
729000 SEK
  • Listing date: 11.06.2026
  • Listing age: 0 days
  • Country: Sweden
  • License plate: WAN828
  • Source: bytbil.com
  • Lot number: 19206268
  • Condition: Used
  • Seller type: Dealer
  • Seller: Bilförsäljningen i Dalar…
  • VIN: WBS11DM04P8D22912

Main specifications

  • First registration: 2023 year
  • Mileage: 4376 km
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 460 HP
  • Transmission: Automatic

Exterior

  • Paint: Black
  • Weight: 2155 kg
  • Length: 4580 mm
  • Width: 1890 mm
  • Height: 1400 mm

Interior

  • Number of seats: 4

Other information

  • Four wheels: No
  • CO2 emission standard: EU6
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.