2023 BMW M3 (Estate) | VIN WBS11GB020FR66153

Car sales history VIN WBS11GB020FR66153
379900 PLN
Above market
Description

BMW M3 Competition xDrive sport 2023 year is for sale in Poland, Szczecin. Imported from Poland. Vehicle 2023 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 510 hp, transmission — Automatic, mileage — 31500 km, body type — Estate, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 31500 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Estate
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Paint: Black

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-07-14 379900 PLN
  • Listing date: 14.07.2026
  • Listing age: 2 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149294456
  • Condition: Used
  • Seller type: Dealer
  • Seller: Dealer BMW Bońkowscy …
  • VIN: WBS11GB020FR66153

Price change history

Date Incl. VAT Excl. VAT Δ
2026-07-14 379900 PLN
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 31500 km
  • Origin: Poland
  • Body type: Estate
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

89
  • ABS
  • Traction control
  • Rear distance control (when parking)
  • Co-driver airbag
  • Power Steering
  • Side airbags - front
  • Radio
  • ACC adaptive cruise control
  • Electric front windows
  • Leather upholstery
  • Fog lamps
  • Driver airbag restraint
  • Air curtains - front
  • Keyless Go
  • Electronic brake force distribution system
  • Heated driver's seat
  • Heated passenger seat
  • Bluetooth interface
  • Electric rear windows
  • Isofix (child seat attachment points)
  • LED daytime running lights
  • Sound system
  • Leather steering wheel
  • Driver's side airbag
  • Steering wheel with radio control
  • USB socket
  • ESP
  • Passenger's knee cushion
  • Windows - Tinted rear
  • Hands-free kit
  • Day time driving lights
  • Satellite navigation system
  • Electrically adjustable passenger seat
  • Armrests - front
  • Differential lock
  • Rain sensor
  • Electric folding side mirrors
  • Electrically adjustable driver's seat
  • Armrests - rear
  • Start the engine without keys
  • Particulate filter
  • Tail lamps with LED technology
  • Air curtains - rear
  • Multi-function steering wheel
  • Sport seats - front
  • Electronic tire pressure monitoring
  • Electrically adjustable lumbar support - passenger
  • Traffic sign recognition system
  • Adaptive lighting
  • Wireless charging of devices
  • Rear parking camera
  • A system that warns of a possible collision
  • Seat with memory setting
  • Side airbags - rear
  • Emergency braking system for pedestrian protection
  • Start/stop system
  • Electrically adjustable lumbar support - driver
  • Blind spot assistant (sensor)
  • Front distance control (when parking)
  • Twilight sensor
  • Lighting the way home
  • Sports steering wheel
  • Speed limiter
  • LED interior lighting
  • Steering wheel gear shift
  • Internet Access
  • High beam assistant
  • Alloy wheels 19
  • Android Auto
  • Headlights with LED technology
  • Apple CarPlay
  • Sport suspension
  • Electric parking brake
  • Seat belt airbag
  • Central airbag
  • Anti-collision system
  • Air curtain at the rear
  • side
  • transverse
  • Independent parking system
  • Collision prevention assistant at intersections
  • Front airbags - rear
  • Active recognition of speed limit signs
  • Touchscreen
  • Driver fatigue detection system
  • Summer tires
  • Head-Up Display
  • Energy recovery system
  • Adjustable center differential
Market analytics
BMW M3 2023 Estate Petrol Automatic ~3.0L 30 000–60 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Above market
379900 PLN
  • Listing date: 14.07.2026
  • Listing age: 2 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149294456
  • Condition: Used
  • Seller type: Dealer
  • Seller: Dealer BMW Bońkowscy Szc…
  • VIN: WBS11GB020FR66153

Main specifications

  • First registration: 2023 year
  • Mileage: 31500 km
  • Origin: Poland
  • Body type: Estate
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.