VIN WBS21CS0609R99152 | BMW XM 2023 (4.4, Automatic)

219900 PLN
Excellent price
Description

BMW XM G09 (2022-) 2023 year is for sale in Poland, Dobrzyniewo Duże. Imported from Poland. Vehicle 2023 model year, fuel type — Hybrid, engine displacement — 4395 cc, power — 652 hp, transmission — Automatic, mileage — 53949 km, body type — SUV, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 53949 km
  • Fuel type: Hybrid
  • Transmission: Automatic
  • Body type: SUV
  • Engine size: 4395 cm3
  • Power: 652 HP
  • Paint: Black

Price change history

Available after login
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149211380
  • Condition: Used
  • Seller type: Dealer
  • Seller: P.U.H.P. Ambit Sp. z …
  • VIN: WBS21CS0609R99152

Price change history

Available after login
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 53949 km
  • Origin: Poland
  • Body type: SUV
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Power: 652 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: Yes
  • Four wheels: Yes
Market analytics
BMW XM 2023 SUV Hybrid Automatic ~4.4L 30 000–60 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Excellent price
219900 PLN
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149211380
  • Condition: Used
  • Seller type: Dealer
  • Seller: P.U.H.P. Ambit Sp. z o.o.
  • VIN: WBS21CS0609R99152

Main specifications

  • First registration: 2023 year
  • Mileage: 53949 km
  • Origin: Poland
  • Body type: SUV
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Power: 652 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: Yes
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.