BMW XM 2025 | mileage 19227 km | VIN WBS21CS0XS9Z77402

157000000 KRW
Good price
Description

Bmw Xm 4.4 2025 year is for sale in South Korea, Suwon, Gyeonggi. Vehicle 2025 model year, fuel type — Hybrid, engine displacement — 4395 cc, transmission — Automatic, mileage — 19227 km, body type — SUV, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 19227 km
  • Fuel type: Hybrid
  • Transmission: Automatic
  • Body type: SUV
  • Engine size: 4395 cm3
  • Paint: Black

Price change history

Available after login
  • Listing date: After login
  • Listing age: After login
  • Country: South Korea
  • License plate: 275모7366
  • Source: encar
  • Lot number: 42305293
  • Condition: Used
  • Seller type: Dealer
  • VIN: WBS21CS0XS9Z77402

Price change history

Available after login
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2025 year
  • Mileage: 19227 km
  • Body type: SUV
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Transmission: Automatic

Exterior

  • Paint: Black

Interior

  • Number of seats: 5

Equipment

41
  • Headlamp
  • Cruise control
  • Curtain/Blind
  • Power door lock
  • Power window
  • Power steering wheel
  • Leather seat
  • Wireless door lock
  • Aluminum wheel
  • Traction Control System (TCS)
  • Airbag (side)
  • Heated seat
  • Automatic air conditioner
  • Power folding side mirror
  • Airbag
  • Steering wheel remote control
  • Parking sensor
  • Tire Pressure Monitoring System (TPMS)
  • Ventilated seat
  • Electronic Stability Control (ESC)
  • Airbag (Curtain)
  • Smart key
  • Rear camera
  • USB port
  • Rain sensor
  • Heated steering wheel
  • Lane Departure Warning System (LDWS)
  • Electronic Parking Brake (EPB)
  • Bluetooth
  • Auto Light
  • ECM rearview mirror
  • Power seat
  • Memory sheet
  • Power-adjustable steering wheel
  • Paddle shift
  • Rear cross-traffic alert system
  • Power Electric Trunk
  • 360-degree around view
  • Head-Up Display (HUD)
  • Massage seat
  • Ghost Door Closing
Market analytics
BMW XM 2025 SUV Hybrid Automatic ~4.4L < 30 000 km South Korea
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Good price
157000000 KRW
  • Listing date: After login
  • Listing age: After login
  • Country: South Korea
  • License plate: 275모7366
  • Source: encar
  • Lot number: 42305293
  • Condition: Used
  • Seller type: Dealer
  • VIN: WBS21CS0XS9Z77402

Main specifications

  • First registration: 2025 year
  • Mileage: 19227 km
  • Body type: SUV
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Transmission: Automatic

Exterior

  • Paint: Black

Interior

  • Number of seats: 5
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.