VIN WBS21DM01S8F61069 | BMW M2 2025 (3.0, Automatic)

83900000 KRW
Fair price
Description

Bmw M2 M2 Coupe 2025 year is for sale in South Korea, Cheonan, Chungnam. Vehicle 2025 model year, fuel type — Petrol, engine displacement — 2993 cc, transmission — Automatic, mileage — 17203 km, body type — SportCar, color — White. Below are the main specifications of the vehicle:

  • Mileage: 17203 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: SportCar
  • Engine size: 2993 cm3
  • Paint: White

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-06-29 84900000 KRW
2026-07-24 83900000 KRW
  • Listing date: 29.06.2026
  • Listing age: 49 days
  • Country: South Korea
  • License plate: 152머8230
  • Source: encar
  • Lot number: 42251045
  • Condition: Used
  • Seller type: Dealer
  • VIN: WBS21DM01S8F61069

Price change history

Date Incl. VAT Excl. VAT Δ
2026-06-29 84900000 KRW
2026-07-24 83900000 KRW
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2025 year
  • Mileage: 17203 km
  • Body type: SportCar
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Transmission: Automatic

Exterior

  • Paint: White

Interior

  • Number of seats: 4

Equipment

34
  • Headlamp
  • Cruise control
  • Curtain/Blind
  • Power door lock
  • Power window
  • Power steering wheel
  • Leather seat
  • Wireless door lock
  • Aluminum wheel
  • Traction Control System (TCS)
  • Airbag (side)
  • Heated seat
  • Automatic air conditioner
  • Power folding side mirror
  • Airbag
  • Steering wheel remote control
  • Parking sensor
  • Tire Pressure Monitoring System (TPMS)
  • Electronic Stability Control (ESC)
  • Airbag (Curtain)
  • Smart key
  • Rear camera
  • USB port
  • Rain sensor
  • Heated steering wheel
  • Lane Departure Warning System (LDWS)
  • Electronic Parking Brake (EPB)
  • Bluetooth
  • Auto Light
  • ECM rearview mirror
  • Power seat
  • Memory sheet
  • Paddle shift
  • Rear cross-traffic alert system
Market analytics
BMW M2 2025 SportCar Petrol Automatic ~3.0L < 30 000 km South Korea
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
83900000 KRW
  • Listing date: 29.06.2026
  • Listing age: 49 days
  • Country: South Korea
  • License plate: 152머8230
  • Source: encar
  • Lot number: 42251045
  • Condition: Used
  • Seller type: Dealer
  • VIN: WBS21DM01S8F61069

Main specifications

  • First registration: 2025 year
  • Mileage: 17203 km
  • Body type: SportCar
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Transmission: Automatic

Exterior

  • Paint: White

Interior

  • Number of seats: 4
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.