BMW X4 2022 (SUV) | VIN WBS21EC0609P06120

231750 PLN
Fair price
Description

BMW X4 F97 (2019-) Competition 2022 year is for sale in Poland, Poznań. Imported from Poland. Vehicle 2022 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 510 hp, transmission — Automatic, mileage — 95000 km, body type — SUV, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 95000 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: SUV
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Paint: Black

Price change history

Available after login
  • Listing date: After login
  • Sold date: 22.08.2026
  • Time to sell: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149455255
  • Condition: Used
  • Seller type: Dealer
  • Seller: POLNAR Cesje Leasingo…
  • VIN: WBS21EC0609P06120

Price change history

Available after login
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2022 year
  • Mileage: 95000 km
  • Origin: Poland
  • Body type: SUV
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

94
  • ABS
  • Traction control
  • Rear distance control (when parking)
  • Co-driver airbag
  • Power Steering
  • Side airbags - front
  • Radio
  • Electric front windows
  • Heated side mirrors
  • Electrically adjustable side mirrors
  • Leather upholstery
  • Fog lamps
  • Driver airbag restraint
  • Cruise control
  • Air curtains - front
  • Keyless Go
  • Electronic brake force distribution system
  • Heated driver's seat
  • Heated passenger seat
  • Bluetooth interface
  • Electric rear windows
  • Brake Assist System
  • Isofix (child seat attachment points)
  • LED daytime running lights
  • Sound system
  • Leather steering wheel
  • USB socket
  • ESP
  • Passenger's knee cushion
  • Windows - Tinted rear
  • Day time driving lights
  • Satellite navigation system
  • Electrically adjustable passenger seat
  • Leather-trimmed shift lever
  • Armrests - front
  • Rain sensor
  • Electric folding side mirrors
  • Electrically adjustable driver's seat
  • Armrests - rear
  • Start the engine without keys
  • Tail lamps with LED technology
  • Air curtains - rear
  • Multi-function steering wheel
  • Sport seats - front
  • Electronic tire pressure monitoring
  • Electrically adjustable lumbar support - passenger
  • Heated steering wheel
  • Traffic sign recognition system
  • Heated rear seats
  • Electronic adjustment of suspension characteristics
  • Wireless charging of devices
  • Rear parking camera
  • A system that warns of a possible collision
  • Seat with memory setting
  • Side airbags - rear
  • Emergency braking system for pedestrian protection
  • Start/stop system
  • Electrically adjustable lumbar support - driver
  • Electrically adjustable steering column
  • Blind spot assistant (sensor)
  • Keyless entry
  • Hook
  • Front distance control (when parking)
  • Twilight sensor
  • Lighting the way home
  • Sports steering wheel
  • Speed limiter
  • Automatic control of the descent from the slope
  • Panoramic roof
  • LED interior lighting
  • Internet Access
  • High beam assistant
  • Android Auto
  • Accident notification system
  • Apple CarPlay
  • Cornering Lights
  • Electric parking brake
  • Anti-collision system
  • side
  • Controlling the distance from the preceding vehicle
  • Rear cross traffic alert
  • Emergency braking assistant in the city
  • Fog lamps with LED technology
  • Ventilated front seats
  • Active recognition of speed limit signs
  • Touchscreen
  • Lane follow assist
  • Driver fatigue detection system
  • 360 Panoramic camera
  • Cornering assistant
  • Head-Up Display
  • Collision minimization system
  • Alloy wheels from 21
  • Laser reflectors
Market analytics
BMW X4 2022 SUV Petrol Automatic ~3.0L 60 000–100 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
231750 PLN
  • Listing date: After login
  • Sold date: 22.08.2026
  • Time to sell: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149455255
  • Condition: Used
  • Seller type: Dealer
  • Seller: POLNAR Cesje Leasingowe …
  • VIN: WBS21EC0609P06120

Main specifications

  • First registration: 2022 year
  • Mileage: 95000 km
  • Origin: Poland
  • Body type: SUV
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.