VIN WBS2U7103KVJ16764 | BMW M2 2019 | Fuel: Petrol | Gearbox: Automatic

604900 SEK
Fair price
Description

BMW M2 2019 year is for sale in Sweden. Vehicle 2019 model year, fuel type — Petrol, engine displacement — 2979 cc, power — 411 hp, transmission — Automatic, mileage — 39740 km, body type — Coupe, color — Silver. Below are the main specifications of the vehicle:

  • Mileage: 39740 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Coupe
  • Engine size: 2979 cm3
  • Power: 411 HP
  • Paint: Silver

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-06-18 608900 SEK
2026-06-29 604900 SEK
  • Listing date: 18.06.2026
  • Listing age: 18 days
  • Country: Sweden
  • License plate: JUH688
  • Source: bytbil.com
  • Lot number: 19223309
  • Condition: Used
  • Seller type: Dealer
  • Seller: Riddermark Bil, Vedde…
  • VIN: WBS2U7103KVJ16764

Price change history

Date Incl. VAT Excl. VAT Δ
2026-06-18 608900 SEK
2026-06-29 604900 SEK
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2019 year
  • Mileage: 39740 km
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2979 cm3
  • Power: 411 HP
  • Transmission: Automatic

Exterior

  • Paint: Silver
  • Weight: 2010 kg
  • Length: 4460 mm
  • Width: 1850 mm
  • Height: 1410 mm

Interior

  • Number of seats: 4

Other information

  • Four wheels: No
  • CO2 emission standard: EU6

Equipment

31
  • cruise control
  • SWEDISH SOLDIER
  • reversing camera
  • Leather upholstery
  • Geared paddles
  • MULTIFUNCTION STEERING WHEEL
  • STEERING WHEEL HEATING
  • Seat heating Front
  • BLUETOOTH
  • Parking sensors Front & Rear
  • APPLE CARPLAY
  • SPORT CHAIRS
  • High beam assistant
  • Helskinn
  • Black Ceiling
  • Tinted rear windows
  • Rear parking sensors
  • Parking sensors Front
  • Harman/Kardon sound systems
  • TeleServices
  • Remote services
  • CONNECTED DRIVE SERVICES
  • Concierge Services
  • STORAGE PACKAGE
  • Shadow Line
  • Wireless phone charging
  • M sports brakes
  • Air conditioning
  • Auto-dimming interior rearview mirror
  • Adaptive LED headlights
  • WiFi hotspot
Market analytics
BMW M2 2019 Coupe Petrol Automatic ~3.0L 30 000–60 000 km Sweden
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
604900 SEK
  • Listing date: 18.06.2026
  • Listing age: 18 days
  • Country: Sweden
  • License plate: JUH688
  • Source: bytbil.com
  • Lot number: 19223309
  • Condition: Used
  • Seller type: Dealer
  • Seller: Riddermark Bil, Veddesta…
  • VIN: WBS2U7103KVJ16764

Main specifications

  • First registration: 2019 year
  • Mileage: 39740 km
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2979 cm3
  • Power: 411 HP
  • Transmission: Automatic

Exterior

  • Paint: Silver
  • Weight: 2010 kg
  • Length: 4460 mm
  • Width: 1850 mm
  • Height: 1410 mm

Interior

  • Number of seats: 4

Other information

  • Four wheels: No
  • CO2 emission standard: EU6
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.