BMW 4 Series 2022 (3.0 Petrol, Automatic) | VIN WBS31BA040CK00441

Description
This BMW 4 Series 2022 with 3.0 engine (510 hp) and 108 749 km mileage was sold in Italy via EU auctions on 24.07.2026. Technical specifications: body type β€” coupe, transmission β€” automatic, color β€” blue. Full history and specifications are available by VIN WBS31BA040CK00441, lot ID β€” 11288899 at EU auctions.

Price change history

Date Price with VAT Price without VAT Status
2026-07-24 No bids placed not sold
  • Sold date: 24.07.2026
  • Country: Italy
  • License plate: GJ229BT
  • Lot number: 11288899
  • Condition: Used
  • Seller type: Organization
  • VIN: WBS31BA040CK00441

Price change history

Date Price with VAT Price without VAT Status
2026-07-24 No bids placed not sold
OpenLane Europe Fee Calculator
EU
UK
Auction price, €
Country
NL
BE
DE
FR
IT
ES
Other
Transaction type ?
Domestic
Export
Additional services
Vehicle exported outside the EU?
Paper invoice required?
Copy of vehicle documents required?
Optimo service? ?
Self-pickup (international)?

Auction Fee β€”
Country Fee β€”
Total fees β€”
Price + Fees β€”
⚠ Transport fee is not included in the calculation β€” depends on the route. Seller Specific Fee may apply to individual lots.
info.openlane.eu β€” effective from 01.12.2025 (EU) / 01.01.2026 (UK)

Main specifications

  • First registration: 2022 year
  • Mileage: 108749 km
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Doors: 2
  • Paint: Blue
  • Weight: 1995 kg
  • Length: 4790 mm
  • Width: 1890 mm

Interior

  • Number of seats: 4
  • Paint: Brown

Other information

  • Damage: Yes
  • Gears number: 8
  • Number of keys: 2

Equipment

57
  • Safety systems - Speed limit control system
  • Wheels & Transmission - Sport suspension
  • Other - Armrest
  • Mirrors / Cameras - Electrical adjustable mirrors
  • Steering wheel - Multifunctional
  • Steering wheel - Leather
  • Safety systems - ESP
  • Safety systems - Distance warning system
  • Windows - Electric front
  • (Car) Infotainment - Apple CarPlay
  • Mirrors / Cameras - Rearview camera
  • (Car) Infotainment - Android Auto
  • Lights - Daytime running lights
  • Safety systems - Lane control assistant
  • (Car) Infotainment - Bluetooth
  • Safety systems - Traffic sign recognition
  • Safety systems - Emergency call
  • Doors - Keyless engine start
  • (Car) Infotainment - Navigation system
  • Seats - Sport
  • Mirrors / Cameras - Folding mirrors electric
  • Steering wheel - Sport
  • Air Conditioning - Automatic climate control
  • Safety systems - Blind spot warning
  • Parking aid - Rear sensors
  • Safety systems - Airbags
  • Seats - Upholstery - Leather
  • Other - Ambient lighting
  • Safety systems - Rain sensor
  • Seats - Lumbar support driver
  • Parking aid - Front sensors
  • (Car) Infotainment - Premium Sound System
  • Seats - Comfort
  • Seats - Electrical adjustable driver
  • Other - Power steering
  • Wheels & Transmission - Alloy wheels
  • Other - Metallic Paint
  • Seats - Upholstery
  • Safety systems - Digital cockpit
  • Seats - Electrical adjustable passenger
  • Safety systems - ABS
  • Wheels & Transmission - 4 wheel drive
  • Steering wheel - Shift paddles
  • (Car) Infotainment - MP3
  • Lights - Light sensor
  • Safety systems - Alarm system
  • Lights - Adaptive Lights
  • Lights - Headlights
  • Wheels & Transmission - Tire pressure monitoring system
  • Seats - Isofix
  • (Car) Infotainment - Voice control
  • Lights - Headlight washer system
  • Steering wheel - Manually adjust
  • Lights - Fog lights
  • Lights - Headlights - Laser headlights
  • Safety systems - Heads-up display
  • Air Conditioning - Automatic climate control - Automatic climate control, 2 zones
Market price trends ?
BMW 4 Series 2022 Coupe Petrol Automatic ~3.0L 100 000–150 000 km EU auctions
  • Sold date: 24.07.2026
  • Country: Italy
  • License plate: GJ229BT
  • Lot number: 11288899
  • Condition: Used
  • Seller type: Organization
  • VIN: WBS31BA040CK00441

Main specifications

  • First registration: 2022 year
  • Mileage: 108749 km
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Doors: 2
  • Paint: Blue
  • Weight: 1995 kg
  • Length: 4790 mm
  • Width: 1890 mm

Interior

  • Number of seats: 4
  • Paint: Brown

Other information

  • Damage: Yes
  • Gears number: 8
  • Number of keys: 2
OpenLane Europe Fee Calculator
EU
UK
Auction price, €
Country
NL
BE
DE
FR
IT
ES
Other
Transaction type ?
Domestic
Export
Additional services
Vehicle exported outside the EU?
Paper invoice required?
Copy of vehicle documents required?
Optimo service? ?
Self-pickup (international)?

Auction Fee β€”
Country Fee β€”
Total fees β€”
Price + Fees β€”
⚠ Transport fee is not included in the calculation β€” depends on the route. Seller Specific Fee may apply to individual lots.
info.openlane.eu β€” effective from 01.12.2025 (EU) / 01.01.2026 (UK)