BMW M3 2026 (3.0 Petrol) | Gearbox: Automatic | VIN WBS31GB010FV65475

1695000 SEK
Excl. VAT 1356000 SEK
Fair price
Description

BMW M3 2026 year is for sale in Sweden. Vehicle 2026 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 551 hp, transmission — Automatic, mileage — 50 km, body type — Estate, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 50 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Estate
  • Engine size: 2993 cm3
  • Power: 551 HP
  • Paint: Black

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-07-20 1695000 SEK 1356000 SEK
  • Listing date: 20.07.2026
  • Listing age: 1 days
  • Country: Sweden
  • License plate: RCD03G
  • Source: bytbil.com
  • Lot number: 19283114
  • Condition: New
  • Seller type: Dealer
  • Seller: Autowåx Bil AB (BMW Å…
  • VIN: WBS31GB010FV65475

Price change history

Date Incl. VAT Excl. VAT Δ
2026-07-20 1695000 SEK 1356000 SEK
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2026 year
  • Mileage: 50 km
  • Body type: Estate
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 551 HP
  • Transmission: Automatic

Exterior

  • Paint: Black
  • Length: 4800 mm
  • Width: 1920 mm
  • Height: 1450 mm

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes
  • CO2 emission standard: EU6
  • CO2 emission (NEDC): 238 gr/km
Market analytics
BMW M3 2026 Estate Petrol Automatic ~3.0L < 30 000 km Sweden
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
1695000 SEK
Excl. VAT 1356000 SEK
  • Listing date: 20.07.2026
  • Listing age: 1 days
  • Country: Sweden
  • License plate: RCD03G
  • Source: bytbil.com
  • Lot number: 19283114
  • Condition: New
  • Seller type: Dealer
  • Seller: Autowåx Bil AB (BMW Åter…
  • VIN: WBS31GB010FV65475

Main specifications

  • First registration: 2026 year
  • Mileage: 50 km
  • Body type: Estate
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 551 HP
  • Transmission: Automatic

Exterior

  • Paint: Black
  • Length: 4800 mm
  • Width: 1920 mm
  • Height: 1450 mm

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes
  • CO2 emission standard: EU6
  • CO2 emission (NEDC): 238 gr/km
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.