BMW M3 2024 (3.0 Petrol) | Gearbox: Automatic | VIN WBS31HJ0X0FT71518

440000 PLN
Above market
Description

BMW M3 2024 year is for sale in Poland, Lublin. Imported from Poland. Vehicle 2024 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 530 hp, transmission — Automatic, mileage — 48860 km, body type — Sedan, color — Green. Below are the main specifications of the vehicle:

  • Mileage: 48860 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 2993 cm3
  • Power: 530 HP
  • Paint: Green

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-08-06 440000 PLN
  • Listing date: 06.08.2026
  • Listing age: 0 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149732056
  • Condition: Used
  • Seller type: Private
  • Seller: Miłosz
  • VIN: WBS31HJ0X0FT71518

Price change history

Date Incl. VAT Excl. VAT Δ
2026-08-06 440000 PLN
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2024 year
  • Mileage: 48860 km
  • Origin: Poland
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 530 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Green

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

30
  • Radio
  • Leather upholstery
  • Cruise control
  • Keyless Go
  • Heated driver's seat
  • Heated passenger seat
  • Bluetooth interface
  • Sound system
  • USB socket
  • Windows - Tinted rear
  • Hands-free kit
  • Satellite navigation system
  • Electrically adjustable passenger seat
  • Electrically adjustable driver's seat
  • Sport seats - front
  • Wireless charging of devices
  • Seat with memory setting
  • Blind spot assistant (sensor)
  • Controlling vehicle functions by voice
  • Internet Access
  • Alloy wheels 19
  • Android Auto
  • Headlights with LED technology
  • Apple CarPlay
  • Ventilated front seats
  • Touchscreen
  • 360 Panoramic camera
  • Summer tires
  • Head-Up Display
  • Air conditioning for rear passengers
Market analytics
BMW M3 2024 Sedan Petrol Automatic ~3.0L 30 000–60 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Above market
440000 PLN
  • Listing date: 06.08.2026
  • Listing age: 0 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149732056
  • Condition: Used
  • Seller type: Private
  • Seller: Miłosz
  • VIN: WBS31HJ0X0FT71518

Main specifications

  • First registration: 2024 year
  • Mileage: 48860 km
  • Origin: Poland
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 530 HP
  • Transmission: Automatic

Exterior

  • Doors: 5
  • Paint: Green

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.