BMW M3 2024 | mileage 13485 km | VIN WBS33HJ09SFU35805

124900 PLN
Excellent price
Description

BMW M3 Competition M xDrive 2024 year is for sale in Poland, Rzeszów. Vehicle 2024 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 530 hp, transmission — Automatic, mileage — 13485 km, body type — Sedan, color — Grey. Below are the main specifications of the vehicle:

  • Mileage: 13485 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 2993 cm3
  • Power: 530 HP
  • Paint: Grey

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-07-02 124900 PLN
  • Listing date: 02.07.2026
  • Listing age: 1 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149083280
  • Condition: Used
  • Seller type: Dealer
  • Seller: TopCar Import Aut z U…
  • VIN: WBS33HJ09SFU35805

Price change history

Date Incl. VAT Excl. VAT Δ
2026-07-02 124900 PLN
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2024 year
  • Mileage: 13485 km
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 530 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Grey

Interior

  • Number of seats: 5

Other information

  • Damage: Yes
  • Four wheels: Yes

Equipment

52
  • Radio
  • Electric front windows
  • Automatic air conditioning
  • Keyless Go
  • Heated driver's seat
  • Heated passenger seat
  • Bluetooth interface
  • Electric rear windows
  • Sound system
  • Leather steering wheel
  • Steering wheel with radio control
  • USB socket
  • Windows - Tinted rear
  • Hands-free kit
  • Parking heating
  • Satellite navigation system
  • Heated windshield
  • Electrically adjustable passenger seat
  • Leather-trimmed shift lever
  • Armrests - front
  • Rain sensor
  • Electrically adjustable driver's seat
  • Armrests - rear
  • Start the engine without keys
  • Multi-function steering wheel
  • Sport seats - front
  • Electrically adjustable lumbar support - passenger
  • Heated steering wheel
  • Heated rear seats
  • Wireless charging of devices
  • Seat with memory setting
  • Electrically adjustable lumbar support - driver
  • Electrically adjustable steering column
  • Glass sunroof - sliding and tilting electric
  • Keyless entry
  • Wipers
  • Controlling vehicle functions by voice
  • Electric opening roof
  • Sports steering wheel
  • Roof opened electrically by remote control
  • Steering wheel gear shift
  • Internet Access
  • Android Auto
  • Apple CarPlay
  • Ventilated front seats
  • Automatic heating control
  • Touchscreen
  • Digital key
  • Head-Up Display
  • Blinds on the side windows lowered manually
  • Ventilated rear seats
  • Alcantara upholstery
Market analytics
BMW M3 2024 Sedan Petrol Automatic ~3.0L < 30 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Excellent price
124900 PLN
  • Listing date: 02.07.2026
  • Listing age: 1 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149083280
  • Condition: Used
  • Seller type: Dealer
  • Seller: TopCar Import Aut z USA …
  • VIN: WBS33HJ09SFU35805

Main specifications

  • First registration: 2024 year
  • Mileage: 13485 km
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 530 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Grey

Interior

  • Number of seats: 5

Other information

  • Damage: Yes
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.