2024 BMW M3 (Sedan) | VIN WBS41AY01RFT45033

997900 SEK
Excl. VAT 798320 SEK
Fair price
Description

BMW M3 2024 year is for sale in Sweden. Vehicle 2024 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 510 hp, transmission — Automatic, mileage — 6250 km, body type — Sedan, color — Red. Below are the main specifications of the vehicle:

  • Mileage: 6250 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Paint: Red

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-06-24 997900 SEK 798320 SEK
  • Listing date: 24.06.2026
  • Listing age: 47 days
  • Country: Sweden
  • License plate: XKJ58P
  • Source: bytbil.com
  • Lot number: 19232906
  • Condition: Used
  • Seller type: Dealer
  • Seller: Bilia Borås BMW
  • VIN: WBS41AY01RFT45033

Price change history

Date Incl. VAT Excl. VAT Δ
2026-06-24 997900 SEK 798320 SEK
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2024 year
  • Mileage: 6250 km
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Paint: Red
  • Weight: 2260 kg
  • Length: 4790 mm
  • Width: 1900 mm
  • Height: 1430 mm

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes
  • CO2 emission standard: EU6

Equipment

9
  • STEERING WHEEL HEATING
  • TONADE RUTOR
  • High gloss shadow line
  • Roof canopy anthracite
  • Parking assistant plus
  • BMW Laserlight
  • Comfort access
  • Rear view camera 360
  • Driving Assistant Professional
Market analytics
BMW M3 2024 Sedan Petrol Automatic ~3.0L < 30 000 km Sweden
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
997900 SEK
Excl. VAT 798320 SEK
  • Listing date: 24.06.2026
  • Listing age: 47 days
  • Country: Sweden
  • License plate: XKJ58P
  • Source: bytbil.com
  • Lot number: 19232906
  • Condition: Used
  • Seller type: Dealer
  • Seller: Bilia Borås BMW
  • VIN: WBS41AY01RFT45033

Main specifications

  • First registration: 2024 year
  • Mileage: 6250 km
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Paint: Red
  • Weight: 2260 kg
  • Length: 4790 mm
  • Width: 1900 mm
  • Height: 1430 mm

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes
  • CO2 emission standard: EU6
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.