This BMW M3 2023 with 3.0L 6 engine and 64 166 km mileage was sold in United States via copart.com on 21.07.2026 for 44 250 USD. Technical specifications: transmission — automatic, color — blue. Damage recorded during inspection: primary — front end, secondary — side. The final price was 16.5% below the last listed price. Full history and specifications are available by VIN WBS43AY06PFN97481, lot ID — 52055116 at copart.com.
The chart shows price trends for similar vehicles over the last 12–15 months based on actual closed transactions.
Average price — the arithmetic mean of all sales per month. Upper bound — 95th percentile: 95% of vehicles sold below this price. Lower bound — 5th percentile: only 5% sold below this price. Filters out anomalously cheap lots.
The shaded area between the bounds covers 90% of actual sales.
Orange badge — the damage type taken into account when selecting comparable lots.
BMW M32023PetrolAutomatic~3.0L60 000–100 000 kmcopart.comFront end