BMW M4 2024 (3.0 Petrol, Automatic) | VIN WBS43AZ06RCP07481

Damage
Primary damage
Front end
Secondary damage
Side
Description
This BMW M4 2024 with 3.0L 6 engine and 90 588 km mileage was sold in United States via copart.com on 09.07.2026 for 41 750 USD. Technical specifications: transmission — automatic, color — black. Damage recorded during inspection: primary — front end, secondary — side. Full history and specifications are available by VIN WBS43AZ06RCP07481, lot ID — 49153616 at copart.com.

Bidding history

Date Price Status
2026-07-09 41750 USD sold
  • Price: 41750 USD
  • Sold date: 09.07.2026
  • Country: United States
  • Source: copart.com
  • Lot number: 49153616
  • Condition: Used
  • Seller type: Private
  • VIN: WBS43AZ06RCP07481

Price change history

Date Price Status
2026-07-09 41750 USD sold
Copart Fee Calculator
Bid, USD ?
Vehicle type ?
License Type ?
Payment type ?
Online bid ?
Via broker ?

Buyer's Fee ?
Gate Fee ?
Virtual Bid Fee ?
Environmental Fee ?
Total fees
Bid + Fees

Main specifications

  • First registration: 2024 year
  • Mileage: 90588 km
  • Fuel type: Petrol
  • Engine size: 3000 cm3
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Paint: Black

Other information

  • Damage: Yes
  • Four wheels: No
  • Number of keys: 1
Market price trends ?
BMW M4 2024 Petrol Automatic ~3.0L 60 000–100 000 km copart.com Front end
  • Price: 41750 USD
  • Sold date: 09.07.2026
  • Country: United States
  • Source: copart.com
  • Lot number: 49153616
  • Condition: Used
  • Seller type: Private
  • VIN: WBS43AZ06RCP07481

Main specifications

  • First registration: 2024 year
  • Mileage: 90588 km
  • Fuel type: Petrol
  • Engine size: 3000 cm3
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Paint: Black

Other information

  • Damage: Yes
  • Four wheels: No
  • Number of keys: 1
Copart Fee Calculator
Bid, USD ?
Vehicle type ?
License Type ?
Payment type ?
Online bid ?
Via broker ?

Buyer's Fee ?
Gate Fee ?
Virtual Bid Fee ?
Environmental Fee ?
Total fees
Bid + Fees