BMW M3 2023 — VIN WBS61AY030FR16582

Car sales history VIN WBS61AY030FR16582
554900 PLN
High price
Description

BMW M3 CS xDrive sport 2023 year is for sale in Poland, Warszawa. Imported from Poland. Vehicle 2023 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 550 hp, transmission — Automatic, mileage — 7100 km, body type — Sedan, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 7100 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 2993 cm3
  • Power: 550 HP
  • Paint: Black

Price change history

Available after login
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149151643
  • Condition: Used
  • Seller type: Dealer
  • Seller: RoyalCars
  • VIN: WBS61AY030FR16582

Price change history

Available after login
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 7100 km
  • Origin: Poland
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 550 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

78
  • ABS
  • Traction control
  • Rear distance control (when parking)
  • Co-driver airbag
  • Power Steering
  • Side airbags - front
  • Radio
  • Electric front windows
  • Heated side mirrors
  • Electrically adjustable side mirrors
  • Leather upholstery
  • Driver airbag restraint
  • Cruise control
  • Air curtains - front
  • Keyless Go
  • Heated driver's seat
  • Heated passenger seat
  • Bluetooth interface
  • Electric rear windows
  • Isofix (child seat attachment points)
  • Sound system
  • Leather steering wheel
  • USB socket
  • ESP
  • Windows - Tinted rear
  • Hands-free kit
  • Day time driving lights
  • Satellite navigation system
  • Electrically adjustable passenger seat
  • Armrests - front
  • Rain sensor
  • Electric folding side mirrors
  • Electrically adjustable driver's seat
  • Armrests - rear
  • Start the engine without keys
  • Particulate filter
  • Tail lamps with LED technology
  • Air curtains - rear
  • Multi-function steering wheel
  • Sport seats - front
  • Electronic tire pressure monitoring
  • Electrically adjustable lumbar support - passenger
  • Traffic sign recognition system
  • Adaptive lighting
  • Wireless charging of devices
  • Rear parking camera
  • A system that warns of a possible collision
  • Seat with memory setting
  • Emergency braking system for pedestrian protection
  • Start/stop system
  • Electrically adjustable lumbar support - driver
  • Blind spot assistant (sensor)
  • Lane assist - lane change control
  • Keyless entry
  • Wipers
  • Front distance control (when parking)
  • Twilight sensor
  • Lighting the way home
  • Electric opening roof
  • Sports steering wheel
  • Steering wheel gear shift
  • Internet Access
  • High beam assistant
  • Alloy wheels 19
  • Android Auto
  • Headlights with LED technology
  • Apple CarPlay
  • Cornering Lights
  • Sport suspension
  • Anti-collision system
  • side
  • Active recognition of speed limit signs
  • Touchscreen
  • Driver fatigue detection system
  • Digital key
  • Head-Up Display
  • Automatic air conditioning: 3 zones
  • Adjustable center differential
Market analytics
BMW M3 2023 Sedan Petrol Automatic ~3.0L < 30 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
High price
554900 PLN
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149151643
  • Condition: Used
  • Seller type: Dealer
  • Seller: RoyalCars
  • VIN: WBS61AY030FR16582

Main specifications

  • First registration: 2023 year
  • Mileage: 7100 km
  • Origin: Poland
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 550 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.