BMW M5 2023 (4.4 Petrol) | Gearbox: Automatic | VIN WBS81CH060CN00757

Car sales history VIN WBS81CH060CN00757
Fair price
Description

BMW M5 F90 [2017 - Prezent] 2023 year is for sale in Romania, Bucuresti. Imported from Germany. Vehicle 2023 model year, fuel type — Petrol, engine displacement — 4395 cc, power — 625 hp, transmission — Automatic, mileage — 18500 km, body type — Sedan, color — Red. Below are the main specifications of the vehicle:

  • Mileage: 18500 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 4395 cm3
  • Power: 625 HP
  • Paint: Red

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-04-13
2026-06-18
  • Listing date: 13.04.2026
  • Listing age: 78 days
  • Country: Romania
  • Source: autovit.ro
  • Lot number: 7060138947
  • Condition: Used
  • Seller type: Dealer
  • Seller: First Motors - Automo…
  • VIN: WBS81CH060CN00757

Price change history

Date Incl. VAT Excl. VAT Δ
2026-04-13
2026-06-18
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 18500 km
  • Origin: Germany
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 4395 cm3
  • Power: 625 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Red

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes

Equipment

78
  • Anti-lock brakes (ABS)
  • Radio
  • Bluetooth interface
  • ESP
  • Airbag - Driver
  • Airbag - Passenger
  • Front curtain airbags
  • Side airbag driver and passenger
  • Rear curtain airbags
  • Isofix points
  • Sports suspension
  • Cruise control
  • Mirrors External - Electric Heated
  • Electronic traction control
  • Adaptive headlights
  • Rear LED lights
  • Interior LED lighting
  • Seats - Heated Driver
  • Seats - Heated Passenger
  • Armrest(s) - Front
  • Armrest(s) - Rear
  • Leather steering wheel
  • Steering Wheel - Sports
  • Rain Sensor
  • Front electric windows
  • Rear electric windows
  • Telephone - Hands Free System
  • USB port
  • Navigation system
  • AM/FM radio, CD audio system
  • Passenger knee airbag
  • Folding exterior mirrors
  • Limiteur de vitesse
  • LED Daytime running lights
  • Eco start/stop
  • Upholstery - Leather
  • Seats - Front Sports
  • Steering Wheel - Multifunctional
  • Steering wheel multifunction with gearshift paddles
  • KESSY Go (Keyless start)
  • Keyless Engine start
  • Voice control
  • Rear view camera
  • 4 zone climate control
  • City Emergency Brake Assist
  • Lane keeping assistant "Lane Assist"
  • Brake assist
  • Electric parking brake
  • Adjustable Steering Wheel - Electric
  • Touch screen
  • Enhanced braking system
  • Break recommendation system during the route
  • Suspension - Electric Controlled
  • LED Headlights
  • Auto headlight range control
  • LED headlights with dynamic curve lighting
  • Guide me home headlights with delay switch-off
  • Electric sunroof
  • Power seat adjuster
  • Front passenger's seat electric adjustments
  • Electric memory seats
  • Keyless go
  • Light alloy wheels 20'
  • Blind spot warning
  • Traffic sign recognition
  • Intelligent emergency call
  • Park assist system
  • Auto parking system
  • Rear climate control
  • Apple Car-play
  • Android Auto
  • Wireless charging
  • Projected digital display with tachometer
  • Internet Access
  • Rear Collision Warning
  • Rear Traffic Alert
  • Driver conditioning monitoring
  • Digital key
Market analytics
BMW M5 2023 Sedan Petrol Automatic ~4.4L < 30 000 km Romania
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
  • Listing date: 13.04.2026
  • Listing age: 78 days
  • Country: Romania
  • Source: autovit.ro
  • Lot number: 7060138947
  • Condition: Used
  • Seller type: Dealer
  • Seller: First Motors - Automotiv…
  • VIN: WBS81CH060CN00757

Main specifications

  • First registration: 2023 year
  • Mileage: 18500 km
  • Origin: Germany
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 4395 cm3
  • Power: 625 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Red

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.