VIN WBS81FK000CT60599 BMW M5 2023 (4.4 Hybrid, Automatic)

116499 EUR
Excl. VAT 96280 EUR
Fair price
Description

BMW M5 xDrive AT PHEV 2023 year is for sale in Romania, Otopeni. Vehicle 2023 model year, fuel type — Hybrid, engine displacement — 4395 cc, power — 727 hp, transmission — Automatic, mileage — 25833 km, body type — Sedan, color — Green. Below are the main specifications of the vehicle:

  • Mileage: 25833 km
  • Fuel type: Hybrid
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 4395 cm3
  • Power: 727 HP
  • Paint: Green

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-06-18 119000 EUR 98347 EUR
2026-07-02 118499 EUR 97933 EUR
2026-07-24 117900 EUR 97438 EUR
2026-07-30 117499 EUR 97107 EUR
2026-08-12 116499 EUR 96280 EUR
  • Listing date: 18.06.2026
  • Listing age: 57 days
  • Country: Romania
  • Source: autovit.ro
  • Lot number: 7060732803
  • Condition: Used
  • Seller type: Dealer
  • Seller: PROMOTORS BUCURESTI
  • VIN: WBS81FK000CT60599

Price change history

Date Incl. VAT Excl. VAT Δ
2026-06-18 119000 EUR 98347 EUR
2026-07-02 118499 EUR 97933 EUR
2026-07-24 117900 EUR 97438 EUR
2026-07-30 117499 EUR 97107 EUR
2026-08-12 116499 EUR 96280 EUR
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 25833 km
  • Body type: Sedan
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Power: 727 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Green

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes
  • CO2 emission (NEDC): 253 gr/km

Equipment

63
  • Anti-lock brakes (ABS)
  • Bluetooth interface
  • ESP
  • Airbag - Driver
  • Airbag - Passenger
  • Front curtain airbags
  • Side airbag driver and passenger
  • Rear curtain airbags
  • Isofix points
  • Rear parking sensors
  • Mirrors External - Electric
  • Mirrors External - Electric Heated
  • Adaptive headlights
  • Headlamp washer
  • Rear LED lights
  • Follow me home headlights
  • Seats - Heated Driver
  • Seats - Heated Passenger
  • Armrest(s) - Front
  • Armrest(s) - Rear
  • Rain Sensor
  • Front electric windows
  • Rear electric windows
  • Navigation system
  • AM/FM radio, CD audio system
  • Folding exterior mirrors
  • Limiteur de vitesse
  • Eco start/stop
  • Upholstery - Leather
  • Seats - Front Sports
  • Steering Wheel - Multifunctional
  • Steering wheel multifunction with gearshift paddles
  • Rear view camera
  • 4 zone climate control
  • City Emergency Brake Assist
  • Automatic emergency city braking
  • Front parking sensors
  • Lane keeping assistant "Lane Assist"
  • Brake assist
  • Electric parking brake
  • Enhanced braking system
  • Suspension - Electric Controlled
  • Auto headlight range control
  • Guide me home headlights with delay switch-off
  • Power seat adjuster
  • Electric memory seats
  • Light alloy wheels 20'
  • Lane change assistant
  • Speed sign recognition
  • Pedestrian Emergency Brake Assist
  • Park assist system
  • Auto parking system
  • Collision prevention assistant at intersections
  • Wireless charging
  • Projected digital display with tachometer
  • Internet Access
  • Emergency assistance
  • All season tyres
  • Adaptative cruise control
  • Side collision warning
  • Ceramic composite brakes
  • Energy recovery system
  • Digital key
Market analytics
BMW M5 2023 Sedan Hybrid Automatic ~4.4L < 30 000 km Romania
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
116499 EUR
Excl. VAT 96280 EUR
  • Listing date: 18.06.2026
  • Listing age: 57 days
  • Country: Romania
  • Source: autovit.ro
  • Lot number: 7060732803
  • Condition: Used
  • Seller type: Dealer
  • Seller: PROMOTORS BUCURESTI
  • VIN: WBS81FK000CT60599

Main specifications

  • First registration: 2023 year
  • Mileage: 25833 km
  • Body type: Sedan
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Power: 727 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Green

Interior

  • Number of seats: 5

Other information

  • Four wheels: Yes
  • CO2 emission (NEDC): 253 gr/km
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.