BMW M5 2025 (4.4 Hybrid) | VIN WBS81FK000CX03296

Car sales history VIN WBS81FK000CX03296
619000 PLN
Above market
Description

BMW M5 2025 year is for sale in Poland, Nowy Tomyśl. Vehicle 2025 model year, fuel type — Hybrid, engine displacement — 4395 cc, power — 727 hp, transmission — Automatic, mileage — 16500 km, body type — Sedan, color — Grey. Below are the main specifications of the vehicle:

  • Mileage: 16500 km
  • Fuel type: Hybrid
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 4395 cm3
  • Power: 727 HP
  • Paint: Grey

Price change history

Available after login
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149206497
  • Condition: Used
  • Seller type: Dealer
  • Seller: PAWELEC MOTO EXPERT
  • VIN: WBS81FK000CX03296

Price change history

Available after login
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2025 year
  • Mileage: 16500 km
  • Body type: Sedan
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Power: 727 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Grey

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

66
  • ABS
  • Traction control
  • Rear distance control (when parking)
  • Co-driver airbag
  • Side airbags - front
  • Electric front windows
  • Heated side mirrors
  • Electrically adjustable side mirrors
  • Leather upholstery
  • Driver airbag restraint
  • Cruise control
  • Air curtains - front
  • Keyless Go
  • Heated driver's seat
  • Heated passenger seat
  • Isofix (child seat attachment points)
  • Sound system
  • Leather steering wheel
  • ESP
  • Satellite navigation system
  • Electrically adjustable passenger seat
  • Armrests - front
  • Rain sensor
  • Electric folding side mirrors
  • Electrically adjustable driver's seat
  • Armrests - rear
  • Start the engine without keys
  • Particulate filter
  • Tail lamps with LED technology
  • Air curtains - rear
  • Multi-function steering wheel
  • Sport seats - front
  • Electronic tire pressure monitoring
  • Traffic sign recognition system
  • Electronic adjustment of suspension characteristics
  • Wireless charging of devices
  • Rear parking camera
  • A system that warns of a possible collision
  • Seat with memory setting
  • Side airbags - rear
  • Emergency braking system for pedestrian protection
  • Start/stop system
  • Blind spot assistant (sensor)
  • Glass sunroof - sliding and tilting electric
  • Keyless entry
  • Front distance control (when parking)
  • Twilight sensor
  • Lighting the way home
  • Electric opening roof
  • Sports steering wheel
  • High beam assistant
  • Alloy wheels 19
  • Android Auto
  • Headlights with LED technology
  • Apple CarPlay
  • Cornering Lights
  • Anti-collision system
  • side
  • Rear cross traffic alert
  • Collision prevention assistant at intersections
  • Active recognition of speed limit signs
  • Touchscreen
  • Driver fatigue detection system
  • Digital key
  • Head-Up Display
  • Air conditioning for rear passengers
Market analytics
BMW M5 2025 Sedan Hybrid Automatic ~4.4L < 30 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Above market
619000 PLN
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149206497
  • Condition: Used
  • Seller type: Dealer
  • Seller: PAWELEC MOTO EXPERT
  • VIN: WBS81FK000CX03296

Main specifications

  • First registration: 2025 year
  • Mileage: 16500 km
  • Body type: Sedan
  • Fuel type: Hybrid
  • Engine size: 4395 cm3
  • Power: 727 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Grey

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.