BMW M5 2023 (4.4 Petrol) — VIN WBS83CH08PCL64216

Damage
Primary damage
Front end
Secondary damage
Side
Description
This BMW M5 2023 with 4.4L 8 engine was sold in United States via copart.com on 09.01.2025 for 28 000 USD. Technical specifications: transmission — automatic, all-wheel drive, color — silver. Damage recorded during inspection: primary — front end, secondary — side. The final price was 36.4% below the last listed price. Full history and specifications are available by VIN WBS83CH08PCL64216, lot ID — 86611734 at copart.com.

Bidding history

Date Price Status
2024-06-12 $44 000 USD not sold
2024-07-02 $66 500 USD not sold
2024-07-05 $65 000 USD not sold
2024-07-30 $62 500 USD not sold
2024-08-02 $53 000 USD not sold
2025-01-10 $28 000 USD sold
  • Price: 28000 USD
  • Sold date: 09.01.2025
  • Country: United States
  • Source: copart.com
  • Lot number: 86611734
  • Condition: Used
  • VIN: WBS83CH08PCL64216

Price change history

Date Price Status
2024-06-12 $44 000 USD not sold
2024-07-02 $66 500 USD not sold
2024-07-05 $65 000 USD not sold
2024-07-30 $62 500 USD not sold
2024-08-02 $53 000 USD not sold
2025-01-10 $28 000 USD sold
Copart Fee Calculator
Bid, USD ?
Vehicle type ?
License Type ?
Payment type ?
Online bid ?
Via broker ?

Buyer's Fee ?
Gate Fee ?
Virtual Bid Fee ?
Environmental Fee ?
Total fees
Bid + Fees

Main specifications

  • First registration: 2023 year
  • Fuel type: Petrol
  • Engine size: 4400 cm3
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Paint: Silver

Other information

  • Damage: Yes
  • Four wheels: Yes
  • Number of keys: 1
Market price trends ?
BMW M5 2023 Petrol Automatic ~4.4L copart.com Front end
  • Price: 28000 USD
  • Sold date: 09.01.2025
  • Country: United States
  • Source: copart.com
  • Lot number: 86611734
  • Condition: Used
  • VIN: WBS83CH08PCL64216

Main specifications

  • First registration: 2023 year
  • Fuel type: Petrol
  • Engine size: 4400 cm3
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Paint: Silver

Other information

  • Damage: Yes
  • Four wheels: Yes
  • Number of keys: 1
Copart Fee Calculator
Bid, USD ?
Vehicle type ?
License Type ?
Payment type ?
Online bid ?
Via broker ?

Buyer's Fee ?
Gate Fee ?
Virtual Bid Fee ?
Environmental Fee ?
Total fees
Bid + Fees