BMW M5 2023 — VIN WBS83CH0XPCL82930

Damage
Primary damage
Front end
Secondary damage
Description
This BMW M5 2023 with 4.4L 8 engine and 41 263 km mileage was sold in United States via copart.com on 16.01.2025 for 50 500 USD. Technical specifications: transmission — automatic, all-wheel drive, color — silver. Damage recorded during inspection: front end. Full history and specifications are available by VIN WBS83CH0XPCL82930, lot ID — 80237694 at copart.com.

Bidding history

Date Price Status
2025-01-16 $50 500 USD sold
  • Price: 50500 USD
  • Sold date: 16.01.2025
  • Country: United States
  • Source: copart.com
  • Lot number: 80237694
  • Condition: Used
  • VIN: WBS83CH0XPCL82930

Price change history

Date Price Status
2025-01-16 $50 500 USD sold
Copart Fee Calculator
Bid, USD ?
Vehicle type ?
License Type ?
Payment type ?
Online bid ?
Via broker ?

Buyer's Fee ?
Gate Fee ?
Virtual Bid Fee ?
Environmental Fee ?
Total fees
Bid + Fees

Main specifications

  • First registration: 2023 year
  • Mileage: 41263 km
  • Fuel type: Petrol
  • Engine size: 4400 cm3
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Paint: Silver

Other information

  • Damage: Yes
  • Four wheels: Yes
Market price trends ?
BMW M5 2023 Petrol Automatic ~4.4L 30 000–60 000 km copart.com Front end
  • Price: 50500 USD
  • Sold date: 16.01.2025
  • Country: United States
  • Source: copart.com
  • Lot number: 80237694
  • Condition: Used
  • VIN: WBS83CH0XPCL82930

Main specifications

  • First registration: 2023 year
  • Mileage: 41263 km
  • Fuel type: Petrol
  • Engine size: 4400 cm3
  • Transmission: Automatic
  • Driving: Yes

Exterior

  • Paint: Silver

Other information

  • Damage: Yes
  • Four wheels: Yes
Copart Fee Calculator
Bid, USD ?
Vehicle type ?
License Type ?
Payment type ?
Online bid ?
Via broker ?

Buyer's Fee ?
Gate Fee ?
Virtual Bid Fee ?
Environmental Fee ?
Total fees
Bid + Fees