BMW M3 2017 (SportCar) | (3.0 Petrol) | VIN WBS8M9104J5J77125

Car sales history VIN WBS8M9104J5J77125
53990000 KRW
Above market
Description

Bmw M3 M3 Sedan Competition 2017 year is for sale in South Korea, Suwon, Gyeonggi. Vehicle 2017 model year, fuel type — Petrol, engine displacement — 2979 cc, transmission — Automatic, mileage — 92822 km, body type — SportCar, color — Tan. Below are the main specifications of the vehicle:

  • Mileage: 92822 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: SportCar
  • Engine size: 2979 cm3
  • Paint: Tan

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-04-23 61990000 KRW
2026-04-26 58990000 KRW
2026-04-29 59990000 KRW
2026-05-05 58990000 KRW
2026-05-08 57990000 KRW
2026-06-15 56990000 KRW
2026-06-26 55990000 KRW
2026-07-16 55790000 KRW
2026-07-28 54990000 KRW
2026-07-31 54490000 KRW
2026-08-03 53990000 KRW
  • Listing date: 23.04.2026
  • Listing age: 112 days
  • Country: South Korea
  • License plate: 237소4032
  • Source: encar
  • Lot number: 41903973
  • Condition: Used
  • Seller type: Dealer
  • VIN: WBS8M9104J5J77125

Price change history

Date Incl. VAT Excl. VAT Δ
2026-04-23 61990000 KRW
2026-04-26 58990000 KRW
2026-04-29 59990000 KRW
2026-05-05 58990000 KRW
2026-05-08 57990000 KRW
2026-06-15 56990000 KRW
2026-06-26 55990000 KRW
2026-07-16 55790000 KRW
2026-07-28 54990000 KRW
2026-07-31 54490000 KRW
2026-08-03 53990000 KRW
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2017 year
  • Mileage: 92822 km
  • Body type: SportCar
  • Fuel type: Petrol
  • Engine size: 2979 cm3
  • Transmission: Automatic

Exterior

  • Paint: Tan

Interior

  • Number of seats: 5

Equipment

33
  • Headlamp
  • Cruise control
  • Power door lock
  • Power window
  • Power steering wheel
  • Leather seat
  • Wireless door lock
  • Aluminum wheel
  • Traction Control System (TCS)
  • Airbag (side)
  • Heated seat
  • Automatic air conditioner
  • Power folding side mirror
  • Airbag
  • Steering wheel remote control
  • Parking sensor
  • Tire Pressure Monitoring System (TPMS)
  • Electronic Stability Control (ESC)
  • Airbag (Curtain)
  • Smart key
  • Rear camera
  • USB port
  • Rain sensor
  • Lane Departure Warning System (LDWS)
  • Bluetooth
  • Auto Light
  • ECM rearview mirror
  • AUX jack
  • Power seat
  • Memory sheet
  • Paddle shift
  • 360-degree around view
  • Head-Up Display (HUD)
Market analytics
BMW M3 2017 SportCar Petrol Automatic ~3.0L 60 000–100 000 km South Korea
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Above market
53990000 KRW
  • Listing date: 23.04.2026
  • Listing age: 112 days
  • Country: South Korea
  • License plate: 237소4032
  • Source: encar
  • Lot number: 41903973
  • Condition: Used
  • Seller type: Dealer
  • VIN: WBS8M9104J5J77125

Main specifications

  • First registration: 2017 year
  • Mileage: 92822 km
  • Body type: SportCar
  • Fuel type: Petrol
  • Engine size: 2979 cm3
  • Transmission: Automatic

Exterior

  • Paint: Tan

Interior

  • Number of seats: 5
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.