VIN WBS41AY000FR19480 | BMW M3 2023 (3.0, Automatic)

Car sales history VIN WBS41AY000FR19480
359900 PLN
Fair price
Description

BMW M3 2023 year is for sale in Poland, Piaseczno. Imported from Poland. Vehicle 2023 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 510 hp, transmission — Automatic, mileage — 70100 km, body type — Sedan, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 70100 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Sedan
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Paint: Black

Price change history

Date Price incl. VAT Price excl. VAT Change
2026-06-25 359900 PLN
  • Listing date: 25.06.2026
  • Listing age: 16 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6148884815
  • Condition: Used
  • Seller type: Dealer
  • Seller: Bawaria Motors Piasec…
  • VIN: WBS41AY000FR19480

Price change history

Date Incl. VAT Excl. VAT Δ
2026-06-25 359900 PLN
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 70100 km
  • Origin: Poland
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

88
  • ABS
  • Co-driver airbag
  • Side airbags - front
  • ACC adaptive cruise control
  • Rear distance control (when parking)
  • Electrically adjustable side mirrors
  • Heated side mirrors
  • Traction control
  • Power Steering
  • Leather upholstery
  • Electric front windows
  • Radio
  • Driver airbag restraint
  • ESP
  • Brake Assist System
  • Air curtains - front
  • Isofix (child seat attachment points)
  • LED daytime running lights
  • Heated driver's seat
  • Heated passenger seat
  • Leather steering wheel
  • Steering wheel with radio control
  • Keyless Go
  • Electric rear windows
  • Windows - Tinted rear
  • Bluetooth interface
  • Hands-free kit
  • USB socket
  • Sound system
  • Day time driving lights
  • Satellite navigation system
  • Electric folding side mirrors
  • Differential lock
  • Electrically adjustable driver's seat
  • Electrically adjustable passenger seat
  • Armrests - front
  • Rain sensor
  • Air curtains - rear
  • Tail lamps with LED technology
  • Sport seats - front
  • Armrests - rear
  • Multi-function steering wheel
  • Start the engine without keys
  • Emergency braking system for pedestrian protection
  • A system that warns of a possible collision
  • Electronic adjustment of suspension characteristics
  • Adjustable suspension
  • Rear parking camera
  • Traffic sign recognition system
  • Adaptive lighting
  • Start/stop system
  • Electronic tire pressure monitoring
  • Traffic jam driving assistant
  • Electrically adjustable lumbar support - driver
  • Electrically adjustable lumbar support - passenger
  • Seat with memory setting
  • Wireless charging of devices
  • Camera in the side mirror
  • Blind spot assistant (sensor)
  • Front distance control (when parking)
  • Dynamic cornering lights
  • Twilight sensor
  • Keyless entry
  • Controlling vehicle functions by voice
  • Automatic control of the descent from the slope
  • Lighting the way home
  • Sports steering wheel
  • Alloy wheels 19
  • Sport suspension
  • Headlights with LED technology
  • High beam assistant
  • Cornering Lights
  • LED interior lighting
  • Electric parking brake
  • Steering wheel gear shift
  • Apple CarPlay
  • Android Auto
  • Internet Access
  • Emergency braking assistant in the city
  • Controlling the distance from the preceding vehicle
  • Ventilated front seats
  • Lane follow assist
  • 360 Panoramic camera
  • Touchscreen
  • Summer tires
  • Cornering assistant
  • Head-Up Display
  • Air conditioning for rear passengers
Market analytics
BMW M3 2023 Sedan Petrol Automatic ~3.0L 60 000–100 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
Fair price
359900 PLN
  • Listing date: 25.06.2026
  • Listing age: 16 days
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6148884815
  • Condition: Used
  • Seller type: Dealer
  • Seller: Bawaria Motors Piaseczno…
  • VIN: WBS41AY000FR19480

Main specifications

  • First registration: 2023 year
  • Mileage: 70100 km
  • Origin: Poland
  • Body type: Sedan
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 4
  • Paint: Black

Interior

  • Number of seats: 5

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.