2023 BMW M4 (Coupe) | VIN WBS41AZ050CP07609

405700 PLN
High price
Description

BMW M4 2023 year is for sale in Poland, Gdańsk. Imported from Poland. Vehicle 2023 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 510 hp, transmission — Automatic, mileage — 34738 km, body type — Coupe, color — Grey. Below are the main specifications of the vehicle:

  • Mileage: 34738 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Coupe
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Paint: Grey

Price change history

Available after login
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149055657
  • Condition: Used
  • Seller type: Dealer
  • Seller: BMW Zdunek - Samochod…
  • VIN: WBS41AZ050CP07609

Price change history

Available after login
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 34738 km
  • Origin: Poland
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 3
  • Paint: Grey

Interior

  • Number of seats: 4

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

92
  • ABS
  • Traction control
  • Rear distance control (when parking)
  • Co-driver airbag
  • Power Steering
  • Side airbags - front
  • Electric front windows
  • Heated side mirrors
  • Electrically adjustable side mirrors
  • Leather upholstery
  • Fog lamps
  • Driver airbag restraint
  • Cruise control
  • Air curtains - front
  • Keyless Go
  • Electronic brake force distribution system
  • Heated driver's seat
  • Heated passenger seat
  • Bluetooth interface
  • Electric rear windows
  • Brake Assist System
  • Isofix (child seat attachment points)
  • LED daytime running lights
  • Leather steering wheel
  • Driver's side airbag
  • USB socket
  • ESP
  • Windows - Tinted rear
  • Hands-free kit
  • Day time driving lights
  • Satellite navigation system
  • Electrically adjustable passenger seat
  • Armrests - front
  • Differential lock
  • Rain sensor
  • Electric folding side mirrors
  • Electrically adjustable driver's seat
  • Armrests - rear
  • Start the engine without keys
  • Tail lamps with LED technology
  • Air curtains - rear
  • Multi-function steering wheel
  • Sport seats - front
  • Electronic tire pressure monitoring
  • Active lane change assistant
  • Traffic jam driving assistant
  • Electrically adjustable lumbar support - passenger
  • Heated steering wheel
  • Traffic sign recognition system
  • Adaptive lighting
  • Wireless charging of devices
  • Rear parking camera
  • A system that warns of a possible collision
  • Seat with memory setting
  • Side airbags - rear
  • Emergency braking system for pedestrian protection
  • Start/stop system
  • Electrically adjustable lumbar support - driver
  • Electrically adjustable steering column
  • Blind spot assistant (sensor)
  • Keyless entry
  • Dynamic cornering lights
  • Front distance control (when parking)
  • Controlling vehicle functions by voice
  • Twilight sensor
  • Lighting the way home
  • Sports steering wheel
  • Speed limiter
  • Steering wheel gear shift
  • High beam assistant
  • Android Auto
  • Active emergency braking assistant
  • Accident notification system
  • Apple CarPlay
  • Cornering Lights
  • Sport suspension
  • Electric parking brake
  • Controlling the distance from the preceding vehicle
  • Rear cross traffic alert
  • Emergency braking assistant in the city
  • Ventilated front seats
  • Collision prevention assistant at intersections
  • Front airbags - rear
  • Touchscreen
  • Lane follow assist
  • Driver fatigue detection system
  • Digital key
  • Head-Up Display
  • Front seats with massage functions
  • Air conditioning for rear passengers
  • Ceramic composite brakes
  • Laser reflectors
Market analytics
BMW M4 2023 Coupe Petrol Automatic ~3.0L 30 000–60 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
High price
405700 PLN
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6149055657
  • Condition: Used
  • Seller type: Dealer
  • Seller: BMW Zdunek - Samochody u…
  • VIN: WBS41AZ050CP07609

Main specifications

  • First registration: 2023 year
  • Mileage: 34738 km
  • Origin: Poland
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 3
  • Paint: Grey

Interior

  • Number of seats: 4

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.