BMW M4 2023 (3.0 Petrol) | Gearbox: Automatic | VIN WBS41AZ070CR24918

Car sales history VIN WBS41AZ070CR24918
383472 PLN
High price
Description

BMW M4 Competition M xDrive sport 2023 year is for sale in Poland, Jazgarzewszczyzna. Imported from Poland. Vehicle 2023 model year, fuel type — Petrol, engine displacement — 2993 cc, power — 510 hp, transmission — Automatic, mileage — 32620 km, body type — Coupe, color — Black. Below are the main specifications of the vehicle:

  • Mileage: 32620 km
  • Fuel type: Petrol
  • Transmission: Automatic
  • Body type: Coupe
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Paint: Black

Price change history

Available after login
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6148753098
  • Condition: Used
  • Seller type: Private
  • VIN: WBS41AZ070CR24918

Price change history

Available after login
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.

Main specifications

  • First registration: 2023 year
  • Mileage: 32620 km
  • Origin: Poland
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 2
  • Paint: Black

Interior

  • Number of seats: 4

Other information

  • Damage: No
  • Four wheels: Yes

Equipment

63
  • ABS
  • Co-driver airbag
  • Side airbags - front
  • Rear distance control (when parking)
  • Traction control
  • Leather upholstery
  • Electric front windows
  • Radio
  • Driver airbag restraint
  • Cruise control
  • ESP
  • Air curtains - front
  • Isofix (child seat attachment points)
  • Heated driver's seat
  • Heated passenger seat
  • Leather steering wheel
  • Keyless Go
  • Bluetooth interface
  • Hands-free kit
  • USB socket
  • Sound system
  • Satellite navigation system
  • Electric folding side mirrors
  • Electrically adjustable driver's seat
  • Electrically adjustable passenger seat
  • Armrests - front
  • Rain sensor
  • Air curtains - rear
  • Particulate filter
  • Tail lamps with LED technology
  • Sport seats - front
  • Armrests - rear
  • Multi-function steering wheel
  • Start the engine without keys
  • Emergency braking system for pedestrian protection
  • A system that warns of a possible collision
  • Side airbags - rear
  • Electronic adjustment of suspension characteristics
  • Rear parking camera
  • Traffic sign recognition system
  • Start/stop system
  • Electronic tire pressure monitoring
  • Electrically adjustable lumbar support - driver
  • Electrically adjustable lumbar support - passenger
  • Seat with memory setting
  • Wireless charging of devices
  • Front distance control (when parking)
  • Lighting the way home
  • Sports steering wheel
  • Electric opening roof
  • Sport suspension
  • Headlights with LED technology
  • Apple CarPlay
  • Android Auto
  • Internet Access
  • Anti-collision system
  • side
  • Active recognition of speed limit signs
  • Driver fatigue detection system
  • Touchscreen
  • Alloy wheels 18
  • Adjustable center differential
  • Plastic roof
Market analytics
BMW M4 2023 Coupe Petrol Automatic ~3.0L 30 000–60 000 km Poland
Market price and activity trends. Upper and lower bounds form a statistically cleansed price range: the top and bottom 5% of extreme prices are excluded. Green zone — lot price is below the market average, red — above market.
High price
383472 PLN
  • Listing date: After login
  • Listing age: After login
  • Country: Poland
  • Source: otomoto.pl
  • Lot number: 6148753098
  • Condition: Used
  • Seller type: Private
  • VIN: WBS41AZ070CR24918

Main specifications

  • First registration: 2023 year
  • Mileage: 32620 km
  • Origin: Poland
  • Body type: Coupe
  • Fuel type: Petrol
  • Engine size: 2993 cm3
  • Power: 510 HP
  • Transmission: Automatic

Exterior

  • Doors: 2
  • Paint: Black

Interior

  • Number of seats: 4

Other information

  • Damage: No
  • Four wheels: Yes
Import Duty Calculator
Vehicle price (€) ?
Country of origin
Destination country
Engine displacement (cc) ?
Fuel type
First registration

Total additional costs
Vehicle price + all fees

⚠️ Calculation is approximate. Please verify with a customs broker.